Difference between revisions of "Smooth stone"

From RimWorld Wiki
Jump to navigation Jump to search
m
m (Added construction nav)
Line 14: Line 14:
 
</onlyinclude>
 
</onlyinclude>
 
This flooring does not require any metal to be constructed, but it needs to be placed on rough stone and takes a greater amount of time to be completed than artificial flooring above.
 
This flooring does not require any metal to be constructed, but it needs to be placed on rough stone and takes a greater amount of time to be completed than artificial flooring above.
 +
 +
{{Nav construction}}

Revision as of 22:24, 24 October 2013

Template:Item infobox

This flooring does not require any metal to be constructed, but it needs to be placed on rough stone and takes a greater amount of time to be completed than artificial flooring above.

Template:Nav construction