Difference between revisions of "Template:Acquisition/doc"
Line 6: | Line 6: | ||
# Crafting time (Modified by what, when infobox is updated) | # Crafting time (Modified by what, when infobox is updated) | ||
# Minimum skill | # Minimum skill | ||
+ | # Gestation cycles | ||
# Ideoligion requirements | # Ideoligion requirements | ||
Revision as of 12:11, 26 April 2023
Goal is to be able to automate the initial paragraph of acquisition. Not finished.
- Workbench/es
- Research
- Techprint
- Required resources
- Crafting time (Modified by what, when infobox is updated)
- Minimum skill
- Gestation cycles
- Ideoligion requirements
Examples
Flak vests can be crafted at a machining table once the flak armor research project has been completed. Each requires 60 Steel, 30 Cloth, 1 Component, 9,000 ticks (2.5 mins) of work modified by the general labor speed of the crafter, and a crafting skill of 4.
Machining tables can be constructed once the machining research project has been completed. Each requires 150 Steel, 5 Components, 3,000 ticks (50 secs) of work modified by the construction speed of the builder, and a construction skill of 4.
War masks can be crafted at a crafting spot, hand tailor bench, or electric tailor bench, each requiring 25 Stuff (Woody) and 3,000 ticks (50 secs) of work modified by the general labor speed of the crafter and the work to make factor of the material.
Stools can be constructed, each requiring 25 Stuff (Metallic/Woody/Stony, 250 for SMVs) and 450 ticks (7.5 secs) of work modified by the construction speed of the builder and the work to build factor and offset of the material.
Cataphract armor can be crafted at a fabrication bench once the cataphract armor research project has been completed. Note that this research requires two techprints. Each requires 150 Plasteel, 50 Uranium, 6 Advanced components, 75,000 ticks (20.83 mins) of work modified by the general labor speed of the crafter, and a crafting skill of 8.
Centurions can be gestated by a mechanitor at a large mech gestator once the ultra mechtech research project has been completed. Note that this research requires a nano structuring chip to unlock. Each requires 300 Steel, 200 Plasteel, 2 Advanced components, 1 Powerfocus chip, 1 High subcore and 12 gestation cycles taking 1,800 ticks (30 secs) each to initiate. They take up 5 bandwidth from their linked mechanitor.