Difference between revisions of "Template:Acquisition/doc"

From RimWorld Wiki
Jump to navigation Jump to search
Line 18: Line 18:
  
 
{{Acquisition|Cataphract armor}}
 
{{Acquisition|Cataphract armor}}
 +
 +
{{Acquisition|Centurion}}
  
 
<includeonly>[[Category:Content templates]]</includeonly>
 
<includeonly>[[Category:Content templates]]</includeonly>
 
<noinclude>[[Category:Template documentation]]</noinclude>
 
<noinclude>[[Category:Template documentation]]</noinclude>

Revision as of 11:54, 26 April 2023

Goal is to be able to automate the initial paragraph of acquisition. Not finished.

  1. Workbench/es
  2. Research
  3. Techprint
  4. Required resources
  5. Crafting time (Modified by what, when infobox is updated)
  6. Minimum skill
  7. Ideoligion requirements

Examples

Flak vests can be crafted at a machining table once the flak armor research project has been completed. Each requires Steel 60 Steel, Cloth 30 Cloth, Component 1 Component, 9,000 ticks (2.5 mins) of work modified by the general labor speed of the crafter, and a crafting skill of 4.

Machining tables can be constructed once the machining research project has been completed. Each requires Steel 150 Steel, Component 5 Components, 3,000 ticks (50 secs) of work modified by the construction speed of the builder, and a construction skill of 4.

War masks can be crafted at a crafting spot, hand tailor bench, or electric tailor bench, each requiring Stuff 25 Stuff (Woody) and 3,000 ticks (50 secs) of work modified by the general labor speed of the crafter and the work to make factor of the material.

Stools can be constructed, each requiring Stuff 25 Stuff (Metallic/Woody/Stony, 250 for SMVs) and 450 ticks (7.5 secs) of work modified by the construction speed of the builder and the work to build factor and offset of the material.

Cataphract armor can be crafted at a fabrication bench once the cataphract armor research project has been completed. Note that this research requires two techprints. Each requires Plasteel 150 Plasteel, Uranium 50 Uranium, Advanced component 6 Advanced components, 75,000 ticks (20.83 mins) of work modified by the general labor speed of the crafter, and a crafting skill of 8.

Centurions can be gestated by a mechanitor at a large mech gestator once the ultra mechtech research project has been completed. Note that this research requires a nano structuring chip to unlock. Each requires Steel 300 Steel, Plasteel 200 Plasteel, Advanced component 2 Advanced components, Powerfocus chip 1 Powerfocus chip, High subcore 1 High subcore and 12 gestation cycles taking 1,800 ticks (30 secs) each to initiate.