Difference between revisions of "Smooth stone"

From RimWorld Wiki
Jump to navigation Jump to search
(Added time for smoothing floor and smoothing wall (do we need separate page for smoothing wall?).)
(Not sure about a separate smooth stone page - would arguably need one for each stone type as they have different stats.)
Line 15: Line 15:
 
}}
 
}}
 
</onlyinclude>
 
</onlyinclude>
This flooring does not require any materials to be constructed, but it needs to be placed on [[rough stone]] and takes a greater amount of time to be completed than any artificial flooring placed on top. Note that smooth floor takes less time than smooth wall counterpart, whereas the later takes 6,500 ticks.
+
This flooring does not require any materials to be constructed, but it needs to be placed on [[rough stone]] and takes a greater amount of time to be completed than any artificial flooring placed on top. Note that smooth floor takes less time than smooth wall counterpart, whereas the later takes {{ticks|6500}}.
  
 
It is recommended to be used as standard flooring whenever available, as it more easily provides the [[Thoughts list#Pleasant environment|pleasant environment bonus]] to your colonists, not to mention it's free. Perfect flooring for a "Dwarfy" colony, built into the side of a mountain.
 
It is recommended to be used as standard flooring whenever available, as it more easily provides the [[Thoughts list#Pleasant environment|pleasant environment bonus]] to your colonists, not to mention it's free. Perfect flooring for a "Dwarfy" colony, built into the side of a mountain.

Revision as of 10:10, 1 June 2021

Smooth stone

Smooth stone

Designate rough stone terrain to be smoothed.

Base Stats

Type
Floor
Market Value
Silver
Beauty
2

Building

Size
1 × 1
Placeable
Yes
Move Speed Factor
100%

Creation

Work To Make
2,800 ticks (46.67 secs)

This flooring does not require any materials to be constructed, but it needs to be placed on rough stone and takes a greater amount of time to be completed than any artificial flooring placed on top. Note that smooth floor takes less time than smooth wall counterpart, whereas the later takes 6,500 ticks (1.81 mins).

It is recommended to be used as standard flooring whenever available, as it more easily provides the pleasant environment bonus to your colonists, not to mention it's free. Perfect flooring for a "Dwarfy" colony, built into the side of a mountain.

Since rough stone floors are widely available in most biomes, an easy way to train colonists in Construction is to select large sections of rough stone and set them for smoothing.